Before buying, please read the followings carefully.
1. Transportation
Port of loading: Mainly shipping from Foshan / Guangzhou Port
Shipping Method: By Sea or by Airplane
2 . What is the Shipping Cost?
If you want to know the shipping freight, The shipping cost is determined by the destination port, weight, packing size, total CBM of the goods . It is difficult for us to quote you the exactly shipping fee without knowing your total quantity of the order and your destination sea port, we will quote you the good shipping cost after receiving your feedback.
3. How to buy your products?
First send us an inquiry for quote, please be specific on products category, product’s name, Product’s item no., quantity and required delivery time.
Then we will response to your request with 24 hours with an itemized quotation sheet, including description, product’s size, CBM, Weight, unit price in USD,Payment term and delivery time and a copy of clearly catalogue for your reference. We may contact you for clarification or options during this period, please carefully review our quote, please do not hesitate to call or email us if you have any question or need any advice, make necessary revisions.
After confirming all the information by you, we will prepare a copy of PI (Proforma Invoice) or Purchase Agreement; we will attach the bank information in the PI.
Our Payment term: 30% T/T as deposit in advance and 70% T/T balance should be paid before shipping.When receive the 30% deposit, we will start the production at once; when the goods are finished, we will take all the pictures from different angle for you reference. After got the 70% balance, we will arrange the shipment for you at once.
At last we will send the Commercial Invoice and Packing list, especial the Original B/L.
Should get more information of our products, please do feel free to contact me. Here is my full contact information.
Product Details:
Place of Origin: | Guangdong, China |
---|---|
Brand Name: | Prostar or OEM/ODM |
Certification: | CE, RoHS, ISO9001, ISO14001 |
Model Number: | PHT1101 |
Wave Form: | Pure Sine Wave |
Transfer Time: | Zero Conversion |
Capacity: | 1KVA/0.8KW |
Input Voltage: | 110-300Vac |
Battery Type: | Sealed Maintenance Free Lead Acid Battery |
Battery Voltage: | 36Vdc |
Product Dimension: | 282x145x220mm |
Product Features: | High frequency tower ups |
Weight: | 4.1 |
Output Voltage: | 200/208/220/230/240Vac |
Phase: | Single Phase |
Type: | On-line |
Protection: | Over voltage, Short circuit, Unbalanced loads |
Application: | Computer,Instrumentation,Medical Equipment,Telecom,Secuirty/Alarm,ATM |
Payment & Shipping Terms:
Minimum Order Quantity: | 10 Piece/Pieces |
---|---|
Price: | US $ 10 - 10,000 / Piece |
Packaging Details: | Standard Export Wooden Package. The Safest Transportation Package |
Delivery Time: | 15~20 days for Routine machine, once received deposit |
Payment Terms: | T/T or L/C. 30% deposit before production, 70% balance before shipment. |
Supply Ability: | 88000 Piece/Pieces per Month |
Specifications
True double-conversion
Capacity:1kVA~10kVA
Input power factor correction
Output power factor 0.8
Function Features
1.True double-conversion online UPS
A true double conversion UPS will provide clean, high level quality power to fully protect mission-critical devices such as sensitive networks, small computer centers, servers, telecom applications, as well as for industrial applications.
2. Output power factor 0.8
Compared to the online UPS in the current market, Venus series UPS provides better output power factor up to 0.8. It offers higher performance and effciency for critical applications.
3. Wide input voltage range (110V-300V)
Venus series can still provide stable power to connected devices under unstable power environments.
4. 50/60 Hz Frequency Converter Mode
Lock output frequency at 50Hz or 60Hz to suit power sensitive equipments.
5. ECO mode operation for energy saving
Offers efficiency as high as 97% to cut energy usage &cost. UPS power application via static bypass, timely returning to online double conversion when the need arises.
6.Emergency Power Off (EPO) Function
This feature can secure the personnel and equipment in case of fires or other emergencies.
7.USB+RS232+RJ45+SNMP,multiple communication for 1-3K models
This feature allows either USB,RS232 or Rj45 communication port to work with SNMP interface simultaneously.
8. DSP technology applied for 6-10K models
A DSP controller provides an improved and cost-effective solution with high performance.
Monitoring Software
• UPS can be connected to the computer via USB or Rs232 interface. So it can be realized LAN monitoring single or many sets of UPS, it also can monitor the other ups which connected to the computer via LAN.
• UPS monitoring software has more than 10 kinds of language for choice.
• Humanized operation interface, which is powerful and can shows the battery voltage, frequency, load, temperature and other data by real-time monitoring through the charts.
• Alarm of different power incident could be set by radio, mobile phone text messages, e-mails and SNMP etc.
ONLINE UPS
ONLINE UPS
ONLINE UPS
ONLINE UPS
ONLINE UPS
ONLINE UPS
Product Pictures
ONLINE UPS
ONLINE UPS
ONLINE UPS
Technical Specification
High Frequency Tower UPS
| ||
MODEL
|
PHT1101
| |
CAPACITY*
|
1000 VA / 800 W
| |
INPUT
| ||
Voltage Range
|
Low Line Transfer
|
160VAC/140VAC/120VAC/110VAC±5%(Ambient Temp.<350C)
( based on load percentage 100% - 80 % / 80 % - 70 % / 70 - 60 % / 60 % - 0)
|
Low Line Comeback
|
175VAC/155VAC/135VAC/125VAC ± 5 % (Ambient Temp.<350C)
( based on load percentage 100% - 80 % / 80 % - 70 % / 70 - 60 % / 60 % - 0)
| |
High Line Transfer
|
300 VAC ± 5 %
| |
High Line Comeback
|
290 VAC ± 5 %
| |
Frequency Range
|
40Hz ~ 70 Hz
| |
Phase
|
Single phase with ground
| |
Power Factor
|
>= 0.99 @ nominal voltage (input voltage)
| |
OUTPUT
| ||
Output voltage
|
200/208/220/230/240VAC
| |
AC Voltage Regulation
|
± 1% (Batt. Mode)
| |
Frequency Range
(Synchronized Range)
|
47 ~ 53 Hz or 57 ~ 63 Hz
| |
Frequency Range (Batt. Mode)
|
50 Hz ± 0.25 Hz or 60Hz ± 0.3 Hz
| |
Overload
|
105%~110%: UPS shuts down after 10 min at battery mode or transfer to bypass when the utility is normal
110%~130%: UPS shuts down after 1min at battery mode or transfer to bypass when the utility is normal
>130%:UPS shuts down after 3seconds at battery mode or transfer to bypass when the utility is normal
| |
Current Crest Ratio
|
3:1
| |
Harmonic Distortion
|
<=3 % THD (Linear Load)
<= 5% THD (Non-linear Load) | |
Transfer Time
|
AC Mode to Batt. Mode
|
Zero
|
Inverter to Bypass
|
4 ms (Typical)
| |
Waveform (Batt. Mode)
|
Pure Sinewave
| |
EFFICIENCY
| ||
AC Mode
|
88%
| |
Battery Mode
|
83%
| |
EXTERNAL BATTERY
| ||
Battery Type
|
Depending on the capacity of external batteries
| |
Battery Numbers
|
3
| |
Charging Current
|
1.0A/2.0A/4.0A/6.0 A
| |
Charging Voltage
|
41.0VDC ± 1%
| |
PHYSICAL
| ||
Dimension, D X W X H (mm)
|
282 X 145 X 220
| |
Net Weight (kgs)
|
4.1
| |
ENVIRONMENT
| ||
Operation Humidity
|
20-90 % RH @ 0- 40°C (non-condensing)
| |
Noise Level
|
Less than 50dBA @ 1 Meter
| |
MANAGEMENT
| ||
Smart RS-232 or USB
|
Supports Windows® 2000/2003/XP/Vista/2008/7/8, Linux, Unix and MAC
| |
Optional SNMP
|
Power management from SNMP manager and web browser
|
*Derate capacity to 80% of capacity in Frequency converter mode or when the output voltage is adjusted to 208VAC/200VAC.
** Product specifications are subject to change without further notice.
ONLINE UPS
ONLINE UPS
ONLINE UPS
Applied Scope
- Industrial Automatic Control
- Medical Equipment
- Office Automation
- Production Equipment
- Electronic & Telecom
- Aeronautics & Astronautics
- Bank ATM
- Army Technology
- Securities System
Warranty
One year warranty after the date of delivery.
Payment Terms
Terms of payment is T/T or L/C. 30% deposit before production, 70% balance before shipment.
FAQ
1.Can I support Air-Conditioning on my UPS? |
Air-Conditioning can be considered as a “dirty” load due to continual switching causing voltage and current spikes and surges. The UPS module can cater for a certain level of overload for a small duration, however the duration and level of current surges typically associated with A/C units is far greater than the UPS’ capability. Therefore it is advised not to support the AC on a UPS and supply this element with a generator only if possible. If there is no option but to support the AC using a UPS, it is normal to oversize the inverter by 4-5 times to ensure that the unit will cater for this more demanding load and eliminate any risk to the critical load. Another sensible approach to reduce any risk is toeth critical load is to have a seperate dedicated UPS for the A/C requirement. |
2.Why choose 'Transformer-based' or 'Transformer-less' UPS? |
Transformer based Traditional technology, typically available from 10 kVA, suitable for industrial applications, galvanic isolation with inverter output transformer, typically standard technology from 100 kVA upwards Transformer-less Typical technology from the smallest ratings up to 120 kVA, more compact footprints, lower weights, more suited to IT applications and environments, high efficiency across the load range, generally more cost effective. |
3.Can I add more UPS modules to the system when my load increases? |
Yes, our SU, HM and HT ranges employ a plug and play parallel system that allows additional units to be added to an existing system at a later date. Additional UPS units can be added to either provide redundancy or extra capacity if the load increases. Sometimes it’s worth investing in additional switchgear early on so that more units can be accommodated much more easily. |
4.Why do you need a UPS? |
An Uninterruptible Power Supply (UPS) is used to protect critical loads from mains supply problems, including spikes, voltage dips, fluctuations and complete power failures using a dedicated battery. A UPS system can also be used to ‘bridge the gap’whilst a standby generator is started and synchronised. |
5.Considerations when choosing a UPS and Generator combination? |
It is usually beneficial to deal with one supplier for both items as this eliminates the potential conflict if the equipment does not work well together. Typical problems are related to input harmonics, load acceptance, poor frequency regulation, voltage intolerance and poor response times. |
6.What is ECO mode? |
ECO mode is often referred to as 'Active Standby' and is mainly used on sites where the general mains supply is relatively stable or the load is not senstive to mains interference. The UPS runs in bypass for normal conditions and transfers the load, without break, to inverter when the mains fails. This configuration is available on our entire UPS range upon request. This mode provides an improved system efficiency of around 98%. |
7.Do I have to replace my UPS batteries with the same brand of batteries? |
If you use brand X and need to replace one or two batteries in the string you should use the same brand because they will have the same characteristics. If you need to replace the whole string then you can change brands with fewer risks. |
8.How can I ensure that my UPS batteries are maintained and serviced properly? |
With proper maintenance, battery life can be predicted and replacements scheduled without interrupting your operations. These are IEEE and OEM recommendations for general maintenance: A.Comprehensive maintenance programs with a monthly inspection and more rigorous quarterly and annual checks B.Re-torque all connections, as required C.Load testing D.Cleaning the battery area, as required |
9.How is battery runtime affected if I reduce the load on the UPS? |
The battery runtime will increase if the load is reduced. As a general rule, if you reduce the load by half, you triple the runtime. |
10.If I add more batteries to a UPS can I add more load? |
Adding more batteries to a UPS can increase the battery runtime to support the load. However, adding more batteries to the UPS does not increase the UPS capacity. Be sure your UPS is adequately sized for your load, and then add batteries to fit your runtime needs. |
[Source From: Prostar UPS]
0 Comments